导 航
查看: 3540|回复: 7

[新闻时讯] 关于南京建TITANIC II的最新动向

[复制链接]
发表于 2012-6-19 20:17:58 | 显示全部楼层 |阅读模式
本帖最后由 只爱ANG 于 2012-6-19 21:58 编辑

Media Release

June 19, 2012

GLOBAL SHIP DESIGN FIRM COMMISSIONED TO TITANIC II PROJECT

Blue Star Line Chairman, Professor Clive Palmer, today announced one of the world’s leading ship design and marine engineering companies has been commissioned to assist with the Titanic II project.

Finnish-based Deltamarin, which has offices worldwide, will undertake a full review of the Titanic II project to ensure the vessel will be compliant with all current safety and construction regulations, as well as meeting the design criteria laid down by Blue Star Line.


The work carried out by Deltamarin will enable China’s CSC Jinling Shipyard to begin construction of the passenger liner.


Professor Palmer said Blue Star Line had been overwhelmed by the international response to the Titanic II project, which was announced in April this year.


“More than 20,000 people have registered on Blue Star Line’s website expressing an interest in receiving regular updates from us or requesting information on how to secure bookings for Titanic II’s maiden voyage,” Professor Palmer stated.


He reaffirmed the 2016 launch date for the ship and the intention for Titanic II to sail from China to England before her maiden passenger voyage retracing its original journey.


“Titanic II will be a regular feature on the transatlantic route between the UK and USA,” Professor Palmer said.


“This magnificent vessel is being constructed in memory of the heroic people who served on the first ship, as well as the passengers who sadly shared their fate.


“We also want to recognise the artists and artisans whose skill, creativity and dexterity has never been fully recognised because of the ship’s limited service.”


On April 30, 2012, Professor Palmer announced to the world his intention to build and launch Titanic II in conjunction with leading Chinese shipbuilders, CSC Jinling Shipyard.


The announcement came 100 years after the original vessel last sailed.


Professor Palmer said Titanic II would have the same dimensions as its predecessor, with 840 rooms and nine decks. The main changes to the original Titanic would be below the water line including welding, a bulbous bow for greater fuel efficiency, diesel generation and bow thrusters for increased manoeuvrability.



Deltamarin specialise in consulting, design and engineering and project management from small concept development tasks and studies, to complete engineering packages in the marine field. They offer services to the marine and offshore industries worldwide.



They were founded in 1990 by a group of naval architects and engineers, some of whom still work for the company. More than 400 people are currently employed by the group worldwide.



Their major projects include ‘Oasis of the Seas’, a vast cruise vessel launched in 2009 that can carry over 5400 people. Also on Deltamarin’s impressive list of more than 5000 marine developments are ‘Celebrity Solstice’ and ‘Celebrity Equinox’, two of the most ground breaking cruise ship designs in operation today.



ENDS

评分

1

查看全部评分

回复

使用道具 举报

发表于 2012-6-19 20:20:28 | 显示全部楼层
沙发{:5_121:}

评分

1

查看全部评分

回复

使用道具 举报

发表于 2012-6-19 20:23:17 | 显示全部楼层
越来越稳当了啊!金陵船厂造,争取早点出山~{:5_122:}
回复

使用道具 举报

发表于 2012-6-19 21:55:03 | 显示全部楼层
造TITANIC 2 是要当做交通工工具 在现实中使用吗?
回复

使用道具 举报

发表于 2012-6-19 22:27:42 | 显示全部楼层
造TITANIC 2 是要当做交通工工具 在现实中使用吗?
只爱ANG 发表于 2012-6-19 21:55
是啊!同问~{:5_121:}
回复

使用道具 举报

发表于 2012-6-20 02:44:31 | 显示全部楼层
哈哈 这船造了绝对一批批的人站在船头的
回复

使用道具 举报

发表于 2012-6-20 08:22:11 | 显示全部楼层
英语不好啊,楼主怎么不弄个中文的啊
回复

使用道具 举报

发表于 2012-10-26 23:04:26 | 显示全部楼层
强烈要求楼主翻译成中文
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 注册

本版积分规则

小黑屋|手机版|

GMT+8, 2024-11-18 18:40 , Processed in 0.121118 second(s), 4 queries , Redis On.

Powered by Discuz! X3.4 Licensed

© 2001-2013 Comsenz Inc.

快速回复 返回顶部 返回列表